About Members Contact
Search
SHG HomeSHG Masthead Image
 
 
Buyers Developers Specifiers Press & Media
 
 
You are here: Steel Homes Group  >  Developers  >  Time

Time

The faster the construction process, the greater the potential savings in cost to the client and main contractor.  All types of steel construction are highly prefabricated and are installed rapidly on site, leading to time-related benefits.

 

Northwood: Modular construction of senior ranks accommodation Case Study
Northwood: Modular construction of senior ranks accommodation
The Northwood project comprises of 3 separate accommodation blocks for senior and junior ranks,
providing a total ...
Joels Inn 4 Star Hotel  Case Study
Joels Inn 4 Star Hotel
The 190 bed Joel’s Inn Hotel development in Dublin demonstrates Caledonian’s ability to develop
solutions which em...
Winton School: Modular construction of mixed tenure residential units Case Study
Winton School: Modular construction of mixed tenure residential units

The Winton School development near Kings Cross in London is a six storey combination of town
houses, apartments...

Infill Walls in Light Steel for Cambridge Apartments Case Study
Infill Walls in Light Steel for Cambridge Apartments
Leading architectural practices Feilden Clegg Bradley (FCB), Alison Brooks Associates (ABA), and Macreanor Lavington ...
The Heights, Corporation Street, Birmingham Case Study
The Heights, Corporation Street, Birmingham
Located on the northern edge of Birmingham city centre, close to Aston University campus, this brown-field site redev...
Apollo Court, Greek Street, Liverpool Case Study
Apollo Court, Greek Street, Liverpool
Liverpool is home to some 32,000 students and UNITE’s new development at Apollo Court in the city centre is helping t...
High-life for Light Steel at Wembley Case Study
High-life for Light Steel at Wembley
The rapid construction programme and site logistics of Wimpey’s 150 unit Chalkhill development in Wembley led the con...
Alexandra Works, Plymouth Case Study
Alexandra Works, Plymouth
The redevelopment of a redundant builders yard and offices to the north of the city centre, this 246 bedroom building...
Capital West Brentford  Case Study
Capital West Brentford
Commanding superb views out over the Thames from the north back over towards Richmond Park, Capital West provides a s...
World’s Largest Modular/Steel Framed Building in Manchester Case Study
World’s Largest Modular/Steel Framed Building in Manchester
Modular supplier, Rollalong, team up with architects, The Design Büro and Ayrshire Framing to construct a 7-storey mo...
Six-storey Housing using Light Steel Framing and Bathroom Modules Case Study
Six-storey Housing using Light Steel Framing and Bathroom Modules
The Peabody Trust chose light steel framing for its social housing development in London, because of experience on ot...
The Paragon Project – Modular construction of high rise residential buildings Case Study
The Paragon Project – Modular construction of high rise residential buildings
This prestigious inner city project for Berkeley First, a division of Berkeley Homes, incorporates a mix of student, ...
Metsec infill walling lightens the load at Devonshire Court Case Study
Metsec infill walling lightens the load at Devonshire Court
Over 12,000m2 of Metsec infill walling has been used as a fast, efficient and lightweight way to enclose Berkeley Hom...
Pre-engineering – a specialist housing landmark, courtesy of Terrapin Case Study
Pre-engineering – a specialist housing landmark, courtesy of Terrapin
Prime Focus was looking for a fast and innovative way to deliver quality, affordable housing for the frail elderly. T...
An Architect’s Riverside House in Light Steel Case Study
An Architect’s Riverside House in Light Steel
Light steel is not just for regular housebuilding. On Oxford’s riverside it demonstrates its versatility and speed of...
First seven storey light steel framed student accommodation Case Study
First seven storey light steel framed student accommodation
Metsec Building Products is supplying over £0.5 million of light gauge steel framing to build a seven storey student ...
Lightweight steel fast tracks three Scottish apartment projects Case Study
Lightweight steel fast tracks three Scottish apartment projects
Scotland’s house building boom is paying dividends for Metsec Building Products who has won contracts worth nearly £3...
Metsec fast tracks flats Case Study
Metsec fast tracks flats
Metsec’s fast track light gauge steel framing system has been used to speed up construction of a six storey apartment...
Fast-track steel framed apartments for Edinburgh Residential Buildings Case Study
Fast-track steel framed apartments for Edinburgh Residential Buildings
A six storey block of apartments in Edinburgh is the latest in a string of flatted developments to be built using Met...
FAQs
Ease of Construction
Cost
Energy Efficiency
Materials & Resources
Robustness
Time
Transportation
Waste
 
 
 
Participating members:
Caledonian LogoCorus LogoFusion Building Systems LogoFutureForm LogoSCI Logo